New elevated highway to cut 40-minute Colombo commute to 5 minutes
This story is no longer in the live feed. First reported .
Newswire reports that construction has started on an elevated road connecting the New Kelani Bridge with the Colombo Port Access Elevated Highway. Project Director Supun Abeywickrama said the route is 5.2 kilometres long.
Newswire reports that Abeywickrama expects motorists to cover the distance in about five to six minutes. He contrasted this with travel on Baseline Road during peak traffic, which he said can take 40 minutes or longer to enter Colombo.
Newswire reports that the highway has been completed as far as Colombo Port and is intended to give motorists access to the port. Abeywickrama said the next section, connecting the port to Galle Face, is planned to begin construction soon.
Newswire reports that, once completed, the road is expected to open to the public and provide a direct route into central Colombo for motorists travelling from Katunayake Airport via the expressway.
Written automatically by AI from the outlets’ own reports, and not reviewed by an editor. It can be wrong — the original report is the authority.
Earlier coverage
Reports on the same subject from the months before this story.
- Newswire · Central Expressway extension to Galewela set to begin this year
- Newswire · CMC explains delays in Baseline Road construction work
- Newswire · New railway bridge to be built across Mahaweli River with Indian funding
- Daily Mirror · New Kelani Bridge ramps face temporary closure
- Hiru News · Kurunegala–Galewela section of Central Expressway set to begin construction on December 1